Research notes Björn Hedin · KTH

How much electricity will Norrbotten need?

The Swedish Energy Agency's scenarios for electricity demand per county, 2025 to 2050, as 3D bars next to today's production at the same scale. In the highest scenario you can stack the production of ten counties before you reach what Norrbotten alone would need.

Sweden's counties as 3D bars of electricity demand in 2050, with today's production stacked beside Norrbotten
Sweden's counties as 3D bars of electricity demand in 2050, with today's production stacked beside Norrbotten

The Swedish Energy Agency publishes scenarios for how much electricity each of Sweden's 21 counties will need up to 2050. They are tables. Energy scenarios per county turns them into 3D bars on a map, next to a second map with today's electricity production per county, drawn at the same scale.

The numbers

Sweden's demand in 2025 is about 128 TWh. For 2050 the three scenarios give 226, 258 and 332 TWh. Production today (around 2023) is about 165 TWh: 70 from hydropower, 47 from nuclear, 34 from wind and 14 from combined heat and power.

Most of the growth is industry in the north. Norrbotten needs about 9 TWh today. In 2050 the scenarios give 45, 66 or, in the scenario called International Growth, 120 TWh. That is close to what the whole country uses now.

Stack it

A number like 120 TWh is hard to feel, so the page has a button: Is today's electricity enough for Norrbotten? Each click lifts one county's current production and puts it on a stack beside Norrbotten, starting in the north and moving south. A glass column shows the demand you are trying to reach.

In the International Growth scenario for 2050 you use all the hydropower and wind of northern Sweden and keep going. The glass is full when you add Uppsala county with the Forsmark nuclear plant, the tenth county on the stack.

Print it

The model exports for 3D printing, as one STL per sector or power source and a coloured 3MF. The default scale is the one we used for our printed models: Sweden is 230 mm from north to south and 1 TWh is 2 mm of height. At that scale Norrbotten's bar in the highest 2050 scenario is 239 mm, taller than the country is long.

Demand: Swedish Energy Agency, regional scenarios. Production: Swedish Energy Agency and Statistics Sweden, around 2023. The scenarios are not forecasts.

Comments? Reply on Bluesky @hedin.it.

Get new posts: Follow on Bluesky Follow on Facebook RSS feed How?

Related